← Back to JobFile
Reserve free

Renovation job file · lead-safe (RRP)

123 Example Avenue, Springfield

Job JF-2026-0142 · Sep 8–10, 2026

Sample · fictional data
Firm
Example Painting Co. (sample)
Firm certification
NAT-F-SAMPLE-01 · expires Mar 2, 2029
Certified renovator
J. Rivera (sample)
Renovator certificate
Hands-on refresher · expires May 12, 2029 · copy attached
Property
Single-family home, built 1926, owner-occupied
Scope
Replace 2 windows in bedroom 2, repaint upstairs hall door casing

1.Pre-renovation education

Renovate Right pamphlet delivered in person to the owner on Sep 2, 2026, 6 days before work began. Owner signed the acknowledgment on the renovator's phone (signature on file, Photo 4). Owner-occupied, so no separate occupant notice.

2.Lead-based paint determination (test kit)

Kit: 3M LeadCheck swabs, EPA-recognized (sample entry). Every component affected by the work was tested.

Component testedLocationResultEvidence
Window sashes, stops and jambs (2 windows)Bedroom 2Lead detectedPhoto 1
Window casings (2 windows)Bedroom 2Lead detectedPhoto 2
Door casingUpstairs hallLead detectedPhoto 3

3.On-the-job training for non-certified workers

WorkerTopics coveredLanguageSigned
M. Chen (sample)Containment setup, HEPA vacuuming, waste bagging, wet cleaningEnglishSep 8, 2026
L. Ortiz (sample)Containment setup, HEPA vacuuming, waste bagging, wet cleaningSpanishSep 8, 2026

4.Signs, containment and waste

  • Warning signs posted at entrances to the work area (Photo 5).
  • Objects removed or covered with plastic; HVAC ducts closed and covered (Photo 6).
  • Windows in the work area closed; doors in the work area closed and sealed, with the entry door covered with plastic (Photo 7).
  • Floor covered with plastic extending 6 feet beyond the perimeter of the surfaces being renovated (Photo 8).
  • Waste bagged and sealed at the end of each day, and kept sealed during transport off site.

5.Cleaning and cleaning verification

  • Paint chips and debris picked up; protective sheeting misted, folded dirty side in and taped for removal.
  • Surfaces HEPA-vacuumed and wet-wiped; floors HEPA-vacuumed and wet-mopped.
AreaVerification card resultCloths used
Bedroom 2, north windowsillWet cloth 1: passed1 wet, 0 dry
Bedroom 2, east windowsillWet cloth 1: failed, re-cleaned; wet cloth 2: passed2 wet, 0 dry
Bedroom 2 floor, 3 sections under 40 sq ftCloths 1–3: passed3 wet, 0 dry
Upstairs hall floor, 2 sections under 40 sq ftCloths 1–2: passed2 wet, 0 dry

6.Certified renovator's certification

I certify that the work practices above were followed on this job, that I trained the workers listed, and that I performed the post-renovation cleaning verification.

J. Rivera, certified renovator (sample)

Sep 10, 2026

Date

Attachments in the full file

Renovator certificate (copy)
1 Test kit, sashes
4 Pamphlet receipt
5 Warning sign