Post-clean verification report · kitchen extract system

The Olive Grove, 14 Example Road, Leeds

Report CF-2026-0318 · cleaned 9 Sep 2026, 22:00–03:30

Sample · fictional data
Contractor
Example Extract Services Ltd (sample)
Engineer
D. Walsh, GHT qualified (sample)
Specification
TR19® Grease
System
Canopy, baffle filters, 11 m duct, roof fan
Kitchen use
Heavy: about 14 hours a day
Whole system cleaned?
No: see exceptions

1.System schematic and access points

CanopyRoof fanAP1AP2AP3AP4Riser section behind plasterboard (no access): between AP3 and AP4

2.Grease deposit readings (microns)

PointLocationMethodPre-cleanPost-clean
AP1Canopy plenum, above filtersWFTT31020
AP2Duct, first bend after canopyWFTT54035
AP3Horizontal duct, 6 m from canopyWFTT42030
AP4Fan inletWFTT38025
Mean41328

3.Before and after photos (matched positions)

AP1 before
AP1 after
AP2 before
AP2 after
AP3 before
AP3 after
AP4 before
AP4 after

4.Exceptions and hazards

  • Not cleaned: 1.5 m riser section between AP3 and AP4, enclosed behind plasterboard with no access panel. Agreed with the site manager before work began.
  • Recommendation: install an access panel on the riser before the next clean.
  • Hazard noted: baffle filters damaged at positions 2 and 5; replacement advised.

5.Recommended cleaning frequency

Heavy use (about 14 hours a day) and pre-clean readings up to 540 microns support a 3-month cleaning interval. Next clean due by 9 December 2026.

6.Sign-off

D. Walsh, engineer (sample)

Site manager, The Olive Grove (sample)